You searched for the word(s): 12
-
OK, so I've read the instructions from Microsoft, the only problem is . . . I need more options.
To sum up, I've created a multiple step sequential approval process. Each reviewer either reject/approves it (using the custom task form created in SPD). Once it's approved, I would like the form to be closed in Read ...
-
I have a sharepoint list and would like to ascend a column.
Is it possible to use Xpath on a repeatable table so it will automatically ascending the data in a column?
I have read that it is possible with XML but couldn't find if it is possible with a sharepoint database connection.
Thanks for any help.
-
this is what i have tried for the exchange amounts:
Dim rate1 As String
Dim Randamt1 As String
Dim foramt1 As ...
-
In Infopath 2007 I have created a repeatable table with a data connection to Sharepoint. In Sharepoint there is a list of all pupils (600 approx) (first and last name, classroom)
The repeatable should look like ...
-
I wouldn't use an optional section for this, but a regular section.
Add the section to your form. You are using IP 2010, so the conditional formatting is now under rules -- select your section, then select Manage Rules from the home tab. Add a new formatting rule that hides the section if your field does not = 'E'. See attached sample ...
-
Thanks mgarant. Actually, that's I what to do. I want to create 1 item in the 'Review' column of my document library, for each Review date in my repeating table i.e. the review dates in the rows of my repeating table, all appear vertically in my Review column.
Someone please help.
-
It's ok, I closed the document down and then reopened and the text now appears.
Obviously some sort of glitch.
-
i havent added the fields for the other exchange amounts, as i am trying to get one portion of it working..
-
Hi,
I am making an international expense claim form for a client.
on the form, i have two date fields (date from and Date to). i also have a days field which has to work out the amount of days between the two dates.
i have tried the datediff function but i cannot get it working. Is there possibly an easier way of doing this as i have no ...
-
u might have selected white color in "header and footer" tab for labels. Check that...