Date Field with 30 days - InfoPath Dev
in

InfoPath Dev

Use our Google Custom Search for best site search results.

Date Field with 30 days

Last post 06-23-2020 08:57 AM by hainh1984. 2 replies.
Page 1 of 1 (3 items)
Sort Posts: Previous Next
  • 06-15-2020 08:59 AM

    Date Field with 30 days

    Dear All, I need your support about Error: "A calculation in the form has not been completed. The number of calculation used for a single action exceeded maximum limit" It only show 16 days not 30 days as calculation. I attached my form. Please help me. Thanks
  • 06-19-2020 11:45 AM In reply to

    Hi - sorry I'm so slow to get back to you. I think I'd approach this differently - with a helper field and a repeating section. Here's a simple sample you can try to see if it works for you w/out hitting the calculation limit. Save the linked file locally. Right click, select Design, then preview and pick a date at the top. This uses default rows - under the data tab, look in the Defaults and you'll see a bunch of rows included by default - and logic on a field called "set" inside the repeating group.
    Hilary Stoupa

  • 06-23-2020 08:57 AM In reply to

    Re: Date Field with 30 days

    Hi Hilary Stoupa, Thank you too much. You are the best.
Page 1 of 1 (3 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.