Workflow to Update multiple Dates - InfoPath Dev
in

InfoPath Dev

Use our Google Custom Search for best site search results.

Workflow to Update multiple Dates

Last post 02-21-2017 04:51 PM by Curtis. 0 replies.
Page 1 of 1 (1 items)
Sort Posts: Previous Next
  • 02-21-2017 04:51 PM

    Workflow to Update multiple Dates

    I have a Equipment list that includes Bldg No, Asset No, Date of Last Inspection, and Inspection Status. The list unique identifier is the Bldg No. The Bldg No may appear several times on the list, based on the number of pieces of equipment in the building. The data from several inspection forms, by way of multiple workflows, update the Date of Last Inspection. As long as there is only one Asset in a building (meaning one Bldg No line item), all workflows have been updating Date of Last Inspection as intended. My question, will the same workflow change multiple dates at the same building, where several assets are located in the building? Example: One Bldg with a furnace, elevator, hot water heater (or, 3 Assets). Will the upload of one inspection form, update the dates of all the assets, where the form is based on the Bldg No (to which the assets associated)?
    Filed under:
Page 1 of 1 (1 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.