We are using a infopath form to have employees do their time cards.
The form is pretty simple but has 3 data sources that look back to our SPS site for a list. A couple of these lists are big.
The form (see
http://www.bojik.com/Time-sheet.pdf) loads into infopath pretty quick but as the user adds new entry lines (see
http://www.bojik.com/Time-sheet2.pdf)the form slows down to crawl.
It takes about 3 to 5 seconds to add a new line if there are more than 20 lines and gets slower the more that are added.
The pull down lists also slow down to a point that the person who enters the cost codes (witch is done after the form is submitted for review so all lines are added) has to pull the list, select the cost code and then do somthing else as it takes 20 seconds +.
Any ideas?
Thanks,
Bryan