-
What version of InfoPath are you using? If you are using IP 2007 or greater, use managed code instead of jscript.
This blog post may help you.
-
Yes, I actually went through and saved the XSN and published it to SP. I then replaced the XSN and XML files in the Qdabra directory with the newly saved template and still have the same problem. I am not mapping the ProjLanguage field in the mapping.
It works fine as long as I dont have one or more matching children. I ...
-
Thanks for attaching the XML.
In the XML, I see that first we have the repeating <Savings> node, and then we have the node
<my:ProjLanguage>ENG</my:ProjLanguage>
The error seems to suggest that the XSN (being used to open the form) expects the ProLanguage node to come before the Savings node.
Are you sure that the XSN ...
-
Hi,
You can accomplish this using rules. The conditions in the rules will look like this:
If Priority=High and Impact=High, then have a rule that sets Severity to Sev2.
If Priority=Normal and Impact=High, then have a rule that sets Severity to Sev2.
And so one, one rule for each possible combination.
Good luck!
-
I'm not sure I understand, but I will elaborate just incase.
On all the lists and libraries there is an option for "Metadata Navigation" under the settings. It is great for organizing your information, but in order to use it the column needs to be a drop down. This works using InfoPath and a list with a few minor work arounds. ...
-
To make sure we are on the same page. I have an Excel workbook with two sheets. Sheet1 and Savings. Sheet1 has the data that populates the main form. Savings has the data the populates the repeating table on the form. In the example below, 12345 is created, but I cannot open the form. 67890 is ...
-
in my form i can get all of the current persons details but i need a field to get their head of department. i know how to get their manager, but this form must be approved by their HoD. is there a way i can do this?
-
Hi,
i have requirement like, document upload at one shot for multiple forms.
can you guys please suggest me the way to do this.
Thanks in advance.
-
Hi,
Please help!! I am trying to calculate an SLA time based on another field. I need to add either 4hours and 8 hours to the current time in order to get my target SLA time.
The problem I have is that this needs to only calculate during office hours. Monday to Friday from 9am to 5.30pm
Does anyone know how i could do ...
-
I used it, It was Really useful, Thanks a lot