Search - InfoPath Dev

InfoPath Dev

Search

Page 2 of 2 (12 items) < Previous 1 2
  • Populating date based on if another field is completed.

    I have an extremely difficult infopath form that has 3 views.&nbsp;&nbsp; The three views are used for different things.&nbsp; The default view populates with the date the form was created.&nbsp; No problems. On the second view I need a date to populate when that section of the form is completed.&nbsp; The only way I have figured out how to do ...
    Posted to Controls (Forum) by Danielle on 06-04-2009
  • Submit Using Code due to Timeout Error

    I have an Infopath form that is submitting to a database and SharePoint 2.0. This form and process is well over a year old.&nbsp; I have been fighting a battle because SharePoint is timing out on our submits during heavy network traffic.&nbsp; Today I received an email that I need to change the submit to be code and to add ...
    Posted to Code (Forum) by Danielle on 05-12-2009
Page 2 of 2 (12 items) < Previous 1 2
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.