Infopath Timesheet Entry - InfoPath Dev
in

InfoPath Dev

Infopath Timesheet Entry

Last post 09-21-2007 06:56 AM by Clay Fox. 1 replies.
Page 1 of 1 (2 items)
Sort Posts: Previous Next
  • 09-21-2007 04:55 AM

    Infopath Timesheet Entry

    Hi All -

     

    Question from someone new to Infopath.

     

    I have 3 Tables I'm working with structured as below

     

    Employee Table

        Employee ID

        Employee Name

     

    Project Table

        Project ID

        Project Name

     

    TimeSheet Table

        Employee ID

        Project ID

        Week Number

        Day 1

        Day 2

        Day 3

        ....

        Day 7

        Comments

     

    I'm trying to create a form that allows a user to select their name from a drop down list and select the week that they are entering.  Once they enter that data they are allowed to enter data into the project section which they choose a project id and then enter all the hours for that week that they worked on it.  They should be able to enter multiple projects by inserting repeating lines.

     

    My problem is that I can't get the form designed right where they can do the above without having to also insert a duplicate employee and week entry which makes the form look silly afterwards.

     

     

    I have a table layed out where the first row is 2 columns.  Column 1 is a repeating section with the employee ID drop down list and Column 2 is the repeating section for the week.

     

    Row 2 has 9 columns for the project id and day data and comment box.

     

    Any thoughts on how to organize this into the needed structure?

  • 09-21-2007 06:56 AM In reply to

    Re: Infopath Timesheet Entry

    I think you are seeing 1 of the limitation of the InfoPath Database form.  The tables are in a database and you can only have one primary dataconnection which can Query and Submit and it creates the whole structure each insert.

    To have greater flexibility InfoPath was designed to utilize web services, which give you the ability to have multiple query and submit connections. I would look at the Database Accelerator package as it includeds many webservices that install right out of the box. Qdabra Database Accelerator Suite Version 2.1.2815 - Developer

     

    If you would like a demo, we already have a timesheet form that does what you describe, using the Database Accelerator services. We have a whole Project Tracker suite of forms for creating SOW documents, tracking resources, and customers, and time against projects which are all integrated.

    Filed under:
Page 1 of 1 (2 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.