How to add a stopwatch to SharePoint Online Task list - InfoPath Dev
in

InfoPath Dev

How to add a stopwatch to SharePoint Online Task list

Last post 03-28-2019 08:45 AM by Angor. 1 replies.
Page 1 of 1 (2 items)
Sort Posts: Previous Next
  • 03-25-2019 09:26 AM

    • Angor
    • Not Ranked
    • Joined on 03-25-2019
    • Posts 2

    How to add a stopwatch to SharePoint Online Task list

    How can I capture current time spend on the task in SharePoint Task list? I want to have 2 buttons, Start and Finish, to get total time spent on a task.
  • 03-28-2019 08:45 AM In reply to

    • Angor
    • Not Ranked
    • Joined on 03-25-2019
    • Posts 2

    Re: How to add a stopwatch to SharePoint Online Task list

    Ok I did some progress, I made the Start & Finish Buttons in IP, and when I checked the values in SPO, for about 30 minutes everything was working fine, and I was getting 2 different values in the 2 columns. But after 30 minutes, both column become showing same value. The old items were different columns, but upon editing them they become same too :(
Page 1 of 1 (2 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.