Search - InfoPath Dev

InfoPath Dev

Use our Google Custom Search for best site search results.

Search

Page 1 of 1 (4 items)
  • Re: Calculating Business Days Between Two Dates

    Thank you so much for all of your help! I would not have been able to figure it out on my own.
    Posted to Code (Forum) by mrosenstein on 05-31-2019
  • Re: Calculating Business Days Between Two Dates

    Thank you so much for your help! From what I can see, the error seems to result from the variable "totalhours" which calculates a value using "workDays" to calculate total working hours. Do you know the best way to go about doing that without getting an error for number of calculations exceeding the maximum limit?
    Posted to Code (Forum) by mrosenstein on 05-29-2019
  • Re: Calculating Business Days Between Two Dates

    The variables within this form that I'm working with to calculate the business days is "firstday", "lastday", "BegDateWN", "EndDateWN", and "workDays". I think the issue arises with BegDateWN and EndDateWN. When using the design checker, I get a warning which states "The custom control has ...
    Posted to Code (Forum) by mrosenstein on 05-29-2019
  • Calculating Business Days Between Two Dates

    I am attempting to follow the alecpojidaev instructions to calculate the amount of working days between two date pickers on my own form using this link: https://alecpojidaev.wordpress.com/2008/12/30/infopath-codeless-programming-walkthrough-2/ . However, after copying his rules directly from his form and running it on my own form, I continue to ...
    Posted to Code (Forum) by mrosenstein on 05-24-2019
Page 1 of 1 (4 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.