Use our Google Custom Search for best site search results.
Search
Page 1 of 1 (5 items)
-
Hi,
Please help!! I am trying to calculate an SLA time based on another field. I need to add either 4hours and 8 hours to the current time in order to get my target SLA time.
The problem I have is that this needs to only calculate during office hours. Monday to Friday from 9am to 5.30pm
Does anyone know how i could do ...
-
Hi, thanks for the response getting 3rd party software installed on our servers is not easy and therefore think code would be easier if i could.
Thanks
K
-
Hi, thanks for the response getting 3rd party software installed on our servers is not easy and therefore think code would be easier if i could.
Thanks
K
-
Hi,
I have a form where it contains a start date and time, and an end date and time. I am trying to work out how long the task was open for based on working days and times... Monday to Friday 09:00 to 17:30.
Does anyone know how i could calculate this using jscript code, or any other way?
Manny Thanks
K
-
Hi,I am designing an InfoPath 2007 form which has a repeating table that contains two rather large Data connections linked to SharePoint lists. The trouble is, when inserting additional rows this gets slower and slower the more I try to add. Is there any way I can speed this up?I was thinking i maybe able to do some via some ...
Page 1 of 1 (5 items)