Search - InfoPath Dev

InfoPath Dev

Search

Page 3946 of 11491 (114909 items) « First ... < Previous 3944 3945 3946 3947 3948 Next > ... Last »
  • Re: DeleteFromSharePoint error

    My initial save command is: concat(&quot;SaveToSharePoint /url=https://cclhomes2.sharepoint.com/aspenlakes/OTP Attachments/&quot;, LotAddress, &quot; /xpath=/my:myFields/my:Attachments/my:Attachment /dsnamews=CopyIntoItems /name=&quot;, LotAddress, &quot; - &quot;, FileType)
    Posted to Qdabra qRules (Forum) by camens on 04-24-2012
  • Re: DeleteFromSharePoint error

    Thanks, but what about your initial save command? Just using the /url and /xpath parameters?
    Posted to Qdabra qRules (Forum) by Hilary Stoupa on 04-24-2012
  • Re: Unable to open a Infopath 2010 form in web browser.

    Hi again, Thanks for posting the question in the other forum thread. This will allow anyone in the community to read and respond.We try to respond to all or most questions in the forum, but sometimes it proves impossible to solve every question due to the complexity of the issue. In other words, sometimes the problem is more complex than what can ...
    Posted to InfoPath 2010 (Forum) by ErnestoM on 04-24-2012
  • Re: How to change the color on the Calendar view

    Hi there, Did you try using conditional formatting in SharePoint designer to do this?&nbsp; Are you using InfoPath at all in your solution or is it all SharePoint?
    Posted to InfoPath 2010 (Forum) by Anson Hidajat on 04-24-2012
  • Re: Same View Multiple Actions

    Perhaps you can create some logic in your views so that you can show/hide certain sections based on what button was pressed.&nbsp; As long as you have a way to keep track of what view you are on and what button you pressed (I would use some temp variables) then you can create some logic (ie. Rules) that will show/hide sections using these ...
    Posted to General (Forum) by Anson Hidajat on 04-24-2012
  • Re: Formulating a Math Calculation in InfoPath

    A date diff is not easy to do in InfoPath out of the box.&nbsp; I believe you&#39;ll need to write custom code or use qRules for that functionality.&nbsp; If you are just using total time then your formula will just look something like: totalField * numUsersField * (percentField/100) Hope this helps!
    Posted to General (Forum) by Anson Hidajat on 04-24-2012
  • Re: Calculate a value based upon a changing variable?

    Perhaps you can have a temp variable that stores number of questions and based on your answers you can calculate via rules how many questions there are.
    Posted to Code (Forum) by Anson Hidajat on 04-24-2012
  • Re: DeleteFromSharePoint error

    I am using this in Filler.&nbsp; My command for setting a value of the field is: concat(&quot;DeleteFromSharePoint /url=&quot;, @qRulesLink) I am using version 4.1.4458.20889
    Posted to Qdabra qRules (Forum) by camens on 04-24-2012
  • Re: Document ID automatically take

    Sorry. but I&#39;m a little confused in what you are trying to do exactly?&nbsp; Are you trying to retrieve the document ID of the entry you just created with your button?&nbsp; Are you trying to open the form?&nbsp; Could you elaborate some more?&nbsp; Thanks!
    Posted to InfoPath 2010 (Forum) by Anson Hidajat on 04-24-2012
  • Calculate a value based upon a changing variable?

    I have a designed infopath form that has a total of 13 questions. The form starts with 9 questions, and based upon the input of 2 questions it can be up to 13 questions long. The questions get introduced into the form in sections, based upon the input of one of the 3 trigger questions. My problem lies in that I have to get a percentage based upon ...
    Posted to Code (Forum) by austin_rion on 04-24-2012
Page 3946 of 11491 (114909 items) « First ... < Previous 3944 3945 3946 3947 3948 Next > ... Last »
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.