Search - InfoPath Dev

InfoPath Dev

Search

Page 3649 of 11491 (114909 items) « First ... < Previous 3647 3648 3649 3650 3651 Next > ... Last »
  • Re: Lot 'o problems

    We all need a good tantrum now and again. Try this one....
    Posted to General (Forum) by Hilary Stoupa on 07-26-2012
  • Re: Lot 'o problems

    Okay Finished my tantrum, and I just can&#39;t let this go.&nbsp; I have cleaned up my fields and put them in the order required.&nbsp; Did not know I could do that.&nbsp; Let&#39;s start over with the first issue.&nbsp; My Contractor Name is a pull down from a secondary source&nbsp;field Name&nbsp;(Secondary Source Name: Info1) From the 2ndary ...
    Posted to General (Forum) by acakeyheli on 07-26-2012
  • Re: Lot 'o problems

    Thank you for your help, I think I am giving up on this.&nbsp; Now it won&#39;t allow me to open once I changed my data.&nbsp; That was one of the issues is that they took an excel sheet and exported it into SP and it was a text field, and entered in DD/MM/YY only sometimes.&nbsp; So I exported the data, fixed the dates and imported it back into ...
    Posted to General (Forum) by acakeyheli on 07-26-2012
  • Re: Lot 'o problems

    I was setting &quot;Rate1&quot; instead of RATE. Try this one for the rate setting. The rule is on contractorname1, so you can edit it if you need to.&nbsp;You&#39;ll want to tidy up your form schema before you ever put this into production, get rid of unused fields. The issue with your filter is probably because of the date format. ...
    Posted to General (Forum) by Hilary Stoupa on 07-26-2012
  • Re: Lot 'o problems

    So I grabbed a contractor, and it did not fill in the rate, but the contract end date populated all the dates in the SP list.&nbsp; Attached is the screen shot in two pages.&nbsp; It keeps going.&nbsp;
    Posted to General (Forum) by acakeyheli on 07-26-2012
  • Re: Lot 'o problems

    Rules run when a field changes. It appears you were trying to set the rule to set the rate on the rate field, not on the contractor name field. I put a rule on contractorname1 to set Rate1. I temporarily put the Contract End Date from your secondary datat source on the bottom of your form - could you preview it and attach a screenshot so I can ...
    Posted to General (Forum) by Hilary Stoupa on 07-26-2012
  • Re: Questions about Rich Text/Text Box and viewable text

    We already gave you some ideas.&nbsp; Did you check them out?
    Posted to Newbie Questions (Forum) by Jimmy on 07-26-2012
  • Re: Lot 'o problems

    There is a Sharepoint list with names and the dates they started and their end dates along with the rates.&nbsp; I need to have the dropdown box pull from that list on the name and autopopulate the end date and rate. &nbsp; I am trying to filter from their end date today and future.&nbsp; That would be the active date I am trying to pull, but ...
    Posted to General (Forum) by acakeyheli on 07-26-2012
  • Re: Lot 'o problems

    Sure, but I could use more info on what you are trying to do. What does this mean: &nbsp;I am doing a data connection with a drop down box and need that to populate the names depending on the active date from today and forward. I see you have a contractor name drop down. Are you trying to filter the names shown in that drop down based on the ...
    Posted to General (Forum) by Hilary Stoupa on 07-26-2012
Page 3649 of 11491 (114909 items) « First ... < Previous 3647 3648 3649 3650 3651 Next > ... Last »
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.