Browser Form calculation sequence - InfoPath Dev
in

InfoPath Dev

Browser Form calculation sequence

Last post 06-19-2013 05:32 AM by MrWilde. 0 replies.
Page 1 of 1 (1 items)
Sort Posts: Previous Next
  • 06-19-2013 05:32 AM

    • MrWilde
    • Top 500 Contributor
      Male
    • Joined on 12-29-2011
    • Brisbane, Australia
    • Posts 40

    Browser Form calculation sequence

    Currently working on a rather large Time Sheet IPFS and having some issues with the 16 calculations limit being exceeded. Trying to work out the limits on calculations and if the count resets on different views.

    I have 7 rows being created in a repeating table and each row has 15 fields. Some fields are updated based on weather the user has any scheduled holiday or time off. The calculations are ran on load. then have several calculations running on the change of the repeating node, to recalculate the allocated flex for each day and then that needs to be recalculated against every day when they enter in there times.

    I have TimeSheet Fortnightly here for anyone to look at. Running out of ideas so if you can think of a more efficient way to run the calculations that would be awesome

Page 1 of 1 (1 items)
Copyright © 2003-2019 Qdabra Software. All rights reserved.
View our Terms of Use.